1. After the installation is completed, start the ball valve to open and close several times, it should be flexible, uniform force, and normal operation of the ball valve.
2. According to pipeline pressure planning requirements, test the sealing function of the joint surface of the ball valve and the pipeline flange after pressure is applied.